N412MX β€” A-Check β€” Project Intelligence

PRJ-2026-002 Β· Prototype analytics β€” non-authoritative.

Project Overview

Aircraft

N412MX Β· Boeing 737-800

Maintenance Type

A CHECK

Status / Priority

IN PROGRESSCRITICAL

Progress

40%

Due Date

2026-03-22

Assigned Technicians

Diego Alvarez

Operational KPIs

Work Orders

1

Completed

0

In Progress

0

Waiting Parts

0

Waiting Inspection

1

Open Defects

1

Checklist Completion

100%

Inspection Status

1 pending

Resource Utilization

Technician Workload

TechnicianWork Orders
Diego Alvarez1

1 of 9 fleet-wide technicians assigned to this project.

Parts

Insufficient source data.

0 part(s) on this project currently at risk.

Wing Structure

IN PROGRESS
45%

Compliance Intelligence

Requirements / Assessments

Upcoming Deadlines

  • 2026-03-25 β€” Fan disk ultrasonic inspection per AD-2026-001
  • 2026-03-18 β€” Integrated drive generator seal repair

Checklist Exceptions

0 UNKNOWN1 FAILED

Inspection / Review Status

Risk Overview

Prototype analytics β€” non-authoritative.

Risk Level

ON TRACK

Main risk drivers / affected work orders:

  • WO-1045 inspection pending β€” Wing Spar Fatigue Inspection
  • Project risk note β€” Wing spar fatigue inspection (WO-1045) is CRITICAL priority β€” pending NDT confirmation of a hairline indication.

Affected resources:

No overloaded technicians or at-risk parts identified.

Recommended: Review WO-1045 in the Inspection Queue