Maintenance Planning

Forward-looking resource and readiness planning β€” every value is derived from current demo data.

Operations Command Center β†’

Work Order Planning

Work OrderAircraftTask / DescriptionPriorityStatusMaterial ReadinessTechnicianAgeRiskRecommended Action
WO-1042VT-ABCEngine Fan InspectionHIGHWaiting InspectionReadyRahul Menon1d overdueHIGHAwaiting inspector review β€” no further planning action.
WO-1044VT-ABCEngine 1 Borescope Follow-upHIGHIn ProgressReadyRahul Menon4d overdueHIGHIn progress β€” no further planning action.
WO-1045N412MXWing Spar Fatigue InspectionCRITICALWaiting InspectionReadyDiego AlvarezDue 2026-03-19HIGHAwaiting inspector review β€” no further planning action.
WO-1046VT-GHICargo Door Latch Mechanism InspectionHIGHMaterial BlockedLATCH-778 unavailableArjun NairDue 2026-03-22HIGHDo not start β€” required part unavailable: LATCH-778.
WO-1048N305MLFan Disk Ultrasonic Inspection Sign-offHIGHWaiting InspectionReadySara Kavanagh7d overdueHIGHAwaiting inspector review β€” no further planning action.
WO-1050VT-ABCHydraulic Pump Seal Condition CheckMEDIUMReadyReadyWei ZhangDue 2026-03-18MEDIUMReady per part records, though work order status still reads WAITING_PARTS β€” Work order status is WAITING_PARTS, but no part currently linked to this work order shows a shortage (source: lib/mock/parts.ts).
WO-1051N412MXIDG Seal RepairCRITICALMaterial BlockedGEN-305 unavailableDiego AlvarezDue 2026-03-21HIGHDo not start β€” required part unavailable: GEN-305.
WO-1052VT-XYZCabin Pressurization CheckMEDIUMIn ProgressReadyFatima Al-SayedDue 2026-03-19HIGHIn progress β€” no further planning action.
WO-1053N118MLBrake Wear InspectionHIGHTechnician RequiredReadyUnassignedDue 2026-03-20MEDIUMAssign a technician before starting.
WO-1054N412MXAPU Starter Motor ReplacementHIGHMaterial BlockedAPU-410 unavailableSara Kavanagh3d overdueHIGHDo not start β€” required part unavailable: APU-410.
WO-1055N221MLFuel Control Unit CalibrationCRITICALMaterial BlockedFCU-220 unavailableRahul Menon2d overdueHIGHDo not start β€” required part unavailable: FCU-220.
WO-1057VT-DEFSeal Kit Replacement β€” Hydraulic ReservoirLOWReadyReadyWei ZhangDue 2026-03-24LOWReady to start when scheduled β€” material and technician are in place.
WO-1058N207MLPitot Heater ReplacementHIGHTechnician RequiredReadyUnassigned1d overdueHIGHAssign a technician before starting.

What Should Maintenance Do Next?

  • Do not start WO-1046 β€” required part(s) unavailable: LATCH-778. Procurement action required.
  • Do not start WO-1051 β€” required part(s) unavailable: GEN-305. Procurement action required.
  • Do not start WO-1054 β€” required part(s) unavailable: APU-410. Procurement action required.
  • Do not start WO-1055 β€” required part(s) unavailable: FCU-220. Procurement action required.
  • Assign a technician before starting WO-1053.
  • Assign a technician before starting WO-1058.

Fleet Planning Overview

Maintenance Backlog

13

Waiting Parts

3

Available Technicians

1

Operational Readiness

36%

Upcoming Maintenance Planner

DateAircraftDescription
2026-03-25N412MXFan disk ultrasonic inspection per AD-2026-001
2026-03-28N305MLFan disk ultrasonic inspection per AD-2026-001
2026-04-02N207MLWing spar fatigue inspection per AD-2026-004
2026-04-05N118MLWing spar fatigue inspection per AD-2026-004

Parts-at-Risk Planning

PartStatusWork Order
FCU-220AWAITING RECEIPTWO-1055 (CRITICAL)
GEN-305ORDEREDWO-1051 (CRITICAL)
LATCH-778AWAITING RECEIPTWO-1046 (HIGH)
APU-410ORDEREDWO-1054 (HIGH)

Technician Capacity & Resource Allocation

TechnicianOpen Work OrdersOverdueOn ShiftCapacity
Rahul Menon33YesOverloaded
Fatima Al-Sayed10YesAssigned
Diego Alvarez20NoOverloaded
Wei Zhang20NoOverloaded
Sara Kavanagh22NoOverloaded
Arjun Nair10YesAssigned
Priya Desai00YesAvailable
Marco Silva00NoAvailable
Elena Petrova00NoAvailable

Active Projects β€” Readiness