WO-1046 β€” Cargo Door Latch Mechanism Inspection

Aircraft VT-GHI Β· Due 2026-03-22

HIGHASSIGNED

Execution

BLOCKED

Evidence Gate

UNKNOWN

Release Readiness

BLOCKED

Planning Status: MATERIAL BLOCKED Β· Risk: HIGH

  • β†’ Aircraft is AOG (open HIGH/CRITICAL defect)
  • β†’ Work order priority is HIGH
  • β†’ Required material unavailable: LATCH-778

Do not start β€” required part unavailable: LATCH-778.

Maintenance Impact

Aircraft AOG: Yes (open HIGH/CRITICAL defect)

Open defects on this aircraft: 1

  • Cargo door latch mechanism exhibits excess play beyond service limit. (HIGH)

Material shortages: LATCH-778

Compliance: AD AD-2026-005

Materials

PartDescriptionStatusQuantity
LATCH-778Cargo Door Latch MechanismAWAITING RECEIPT1

Technician

Assigned: Arjun Nair

Technician Authorization

A high certification match or availability ranking above is a recommendation, not authorization β€” this table is the formal authorization determination and always takes precedence. A hard authorization block is never overridden by a strong recommendation.

TechnicianStatusReasons
Rahul MenonAUTHORIZEDCertification match: Borescope Inspection On shift now UNKNOWN: no aircraft-type qualification record exists for this technician in this dataset.
Priya DesaiUNKNOWNOn shift now No other open work orders UNKNOWN: no aircraft-type qualification record exists for this technician in this dataset.
Fatima Al-SayedUNKNOWNOn shift now UNKNOWN: no aircraft-type qualification record exists for this technician in this dataset.
Arjun NairUNKNOWNOn shift now UNKNOWN: no aircraft-type qualification record exists for this technician in this dataset.
Marco SilvaNOT AUTHORIZEDNo other open work orders UNKNOWN: no aircraft-type qualification record exists for this technician in this dataset. No certification-keyword match on file for this work order. Not currently on shift.
Elena PetrovaNOT AUTHORIZEDNo other open work orders UNKNOWN: no aircraft-type qualification record exists for this technician in this dataset. No certification-keyword match on file for this work order. Not currently on shift.
Diego AlvarezNOT AUTHORIZEDUNKNOWN: no aircraft-type qualification record exists for this technician in this dataset. No certification-keyword match on file for this work order. Not currently on shift.
Wei ZhangNOT AUTHORIZEDUNKNOWN: no aircraft-type qualification record exists for this technician in this dataset. No certification-keyword match on file for this work order. Not currently on shift.
Sara KavanaghNOT AUTHORIZEDUNKNOWN: no aircraft-type qualification record exists for this technician in this dataset. No certification-keyword match on file for this work order. Not currently on shift.

Evidence

Prototype storage only β€” images are held as in-browser object references for this session and are not persisted to production object storage. Uploading a photo records that an artifact was captured; it is never treated as proof of airworthiness, compliance, or acceptable workmanship on its own.

UNKNOWN

Evidence requirement is not defined for this task.

No evidence submitted for this work order yet.

Add Evidence

Maintenance Task & Release

Technician completion is separate from release. "ASSIGNED" describes the work order status; the execution state below tracks whether this work order has actually cleared inspection and is ready for release.

Traceability Chain

Task Execution

Performed by: Arjun Nair (assigned, not yet signed off)

Inspected by: No inspection required for this task.

Execution State: BLOCKED

Work is blocked before starting (material or qualification gate open).

Safety GateStatusReason
MATERIAL GATEFAILRequired material unavailable: LATCH-778
QUALIFICATION GATEPASSA technician is assigned.
INSPECTION GATENOT REQUIREDNo inspection is indicated as required for this work order.
EVIDENCE GATEPASSReference on file: AD (AD AD-2026-005).
EXECUTION EVIDENCE GATEUNKNOWNEvidence requirement is not defined for this task.
RELEASE GATEFAILNot yet released β€” current execution state: BLOCKED.

Release Readiness

Whether this application's known operational gates are satisfied β€” not an airworthiness or dispatch determination.

BLOCKED
  • [MATERIAL] Required material unavailable: LATCH-778 β€” Resolve the material shortage (Material Readiness / Procurement). (source: Safety Gate: MATERIAL_GATE)
  • [EVIDENCE] Evidence requirement is not defined for this task. β€” Resolve the missing source data before this gate can be evaluated as PASS or FAIL. (source: Safety Gate: EXECUTION_EVIDENCE_GATE)
  • [UNKNOWN] Not yet released β€” current execution state: BLOCKED. β€” Resolve the identified blocker. (source: Safety Gate: RELEASE_GATE)
  • [REGULATORY] Assessment is NON COMPLIANT. β€” Resolve the regulatory assessment (Compliance). (source: Assessment asmt-bulk-3)

Work Order History

The recorded history for WO-1046, read directly from the audit trail. This is a session-only prototype β€” only actions taken in this session (or seeded at startup) appear here; no lifecycle step is shown unless it was actually recorded.

No recorded actions for this work order yet.