Skip to main content
Ask Lisa
Priya Nair

Release Readiness

Whether each work order approaching release has satisfied this application's known operational gates β€” material, technician authorization, inspection, evidence, deferred items, and regulatory assessments. This is gate/data completeness only, never an airworthiness or dispatch determination; release remains a human, authorized-signatory decision.

What Needs To Happen Before Release

The next blocker to clear for each blocked work order, in the order the readiness engine already evaluates them (safety gates, then overdue deferred items, then regulatory assessments) β€” not a separately invented priority.

Work OrderCategoryNext Step
WO-1042 VT-ABCInspectionAssign an eligible independent inspector.AOG Recovery β†’
WO-1045 N412MXInspectionAssign an eligible independent inspector.AOG Recovery β†’
WO-1048 N305MLInspectionAssign an eligible independent inspector.AOG Recovery β†’
WO-1042VT-ABCΒ· INSPECTION REQUIRED
DELAYEDBLOCKED

Due date has passed by 1 day(s).

4 blockers

Inspection

  • Independent inspection required before release β€” eligible inspector(s): Sara Kavanagh, Diego Alvarez. The assigned technician cannot inspect their own work. β€” Assign an eligible independent inspector. (source: Safety Gate: INSPECTION_GATE)

Unknown

  • Not yet released β€” current execution state: INSPECTION REQUIRED. β€” Resolve the identified blocker. (source: Safety Gate: RELEASE_GATE)

Regulatory

  • Assessment is NON COMPLIANT. β€” Resolve the regulatory assessment (Compliance). (source: Assessment asmt-2)
  • Assessment is REVIEW REQUIRED. β€” Resolve the regulatory assessment (Compliance). (source: Assessment asmt-1)
WO-1045N412MXΒ· INSPECTION REQUIRED
TAT AT RISKBLOCKED

Due in 2 day(s) with 4 open release blocker(s) unresolved.

4 blockers

Inspection

  • Independent inspection required before release β€” eligible inspector(s): Sara Kavanagh. The assigned technician cannot inspect their own work. β€” Assign an eligible independent inspector. (source: Safety Gate: INSPECTION_GATE)

Unknown

  • Not yet released β€” current execution state: INSPECTION REQUIRED. β€” Resolve the identified blocker. (source: Safety Gate: RELEASE_GATE)

Regulatory

  • Assessment is NON COMPLIANT. β€” Resolve the regulatory assessment (Compliance). (source: Assessment asmt-bulk-0)
  • Assessment is NON COMPLIANT. β€” Resolve the regulatory assessment (Compliance). (source: Assessment asmt-bulk-7)
WO-1048N305MLΒ· INSPECTION REQUIRED
DELAYEDBLOCKED

Due date has passed by 7 day(s).

5 blockers

Inspection

  • Independent inspection required before release β€” eligible inspector(s): Diego Alvarez. The assigned technician cannot inspect their own work. β€” Assign an eligible independent inspector. (source: Safety Gate: INSPECTION_GATE)

Evidence

  • No maintenance task reference is linked to this work order. β€” Resolve the missing source data before this gate can be evaluated as PASS or FAIL. (source: Safety Gate: EVIDENCE_GATE)

Unknown

  • Not yet released β€” current execution state: INSPECTION REQUIRED. β€” Resolve the identified blocker. (source: Safety Gate: RELEASE_GATE)

Regulatory

  • Assessment is NON COMPLIANT. β€” Resolve the regulatory assessment (Compliance). (source: Assessment asmt-bulk-5)
  • Assessment is NON COMPLIANT. β€” Resolve the regulatory assessment (Compliance). (source: Assessment asmt-bulk-10)