Maintenance Records
16 compliance-oriented maintenance events across the fleet
| Date | Aircraft | Type | Description | Status | Requirement | Assessment |
|---|---|---|---|---|---|---|
| 2026-03-14 | VT-ABC | INSPECTION | Fan disk ultrasonic inspection per AD-2026-001 | COMPLETED | AD-2026-001 | asmt-2 |
| 2026-02-11 | VT-ABC | INSTALLATION | Engine 1 (CFM56-7B SN 100781) installed | COMPLETED | β | β |
| 2026-02-10 | VT-ABC | REMOVAL | Engine 1 (CFM56-7B SN 100234) removed for scheduled overhaul | COMPLETED | β | β |
| 2026-03-16 | VT-ABC | INSPECTION | Hydraulic pump seal condition check per SB-2025-114 | AWAITING REVIEW | SB-2025-114 | β |
| 2026-03-25 | N412MX | INSPECTION | Fan disk ultrasonic inspection per AD-2026-001 | SCHEDULED | AD-2026-001 | asmt-bulk-0 |
| 2026-03-05 | VT-GHI | INSPECTION | Cargo door latch mechanism inspection per AD-2026-005 | OVERDUE | AD-2026-005 | asmt-bulk-3 |
| 2026-03-18 | N412MX | REPAIR | Integrated drive generator seal repair | IN PROGRESS | β | β |
| 2025-08-01 | N412MX | OVERHAUL | APU overhaul completed and returned to service | COMPLETED | β | β |
| 2026-01-20 | VT-GHI | REPLACEMENT | APU replacement β completion evidence not yet uploaded | AWAITING EVIDENCE | β | β |
| 2026-03-28 | N305ML | INSPECTION | Fan disk ultrasonic inspection per AD-2026-001 | SCHEDULED | AD-2026-001 | asmt-bulk-5 |
| 2026-04-02 | N207ML | INSPECTION | Wing spar fatigue inspection per AD-2026-004 | SCHEDULED | AD-2026-004 | asmt-bulk-1 |
| 2026-02-16 | N221ML | INSPECTION | Pitot tube heater functional check per AD/A320/112 | COMPLETED | AD/A320/112 | asmt-bulk-6 |
| 2026-02-28 | VT-JKL | INSPECTION | Cargo door latch mechanism inspection per AD-2026-005 | OVERDUE | AD-2026-005 | asmt-bulk-4 |
| 2025-11-03 | VT-ABC | INSTALLATION | Hydraulic pump HP-442 (SN HP001) installed | COMPLETED | β | β |
| 2026-04-05 | N118ML | INSPECTION | Wing spar fatigue inspection per AD-2026-004 | SCHEDULED | AD-2026-004 | asmt-bulk-2 |
| 2026-03-09 | N305ML | INSPECTION | Fan disk ultrasonic inspection completed, pending engineering sign-off | AWAITING REVIEW | AD-2026-001 | asmt-bulk-5 |