Skip to main content
Ask Lisa
Priya Nair

⚠ Fictional demo record. Not a real, current, or legally binding requirement.

AD/A320/112

β€œPitot Tube Heater Functional Check”

PUBLISHED

Authority

CASA β€” Civil Aviation Safety Authority (Australia)

Revision

0

Effective

2026-02-15

The AeroComply Loop for this Requirement

Description

Fictional demo AD requiring a functional check of the pitot tube heating element on affected A320-200 aircraft.

Compliance time: Within 30 days of effective date

Impact β€” Affected Aircraft, Compliance Status & Action Required

This traces only real applicability assessment links already recorded in the dataset β€” aircraft this requirement has actually been evaluated against, not an inferred fleet match.

AircraftSystem ResultCompliance StatusAction Required
N221MLApplicableNon-CompliantCorrective action required
N207MLNot ApplicableCompliantNone β€” compliant

Linked Maintenance Tasks

Maintenance events recorded with a direct relatedRequirementId link to this requirement.

AircraftTaskDateStatus
N221MLPitot tube heater functional check per AD/A320/1122026-02-16COMPLETED

AI Assistance β€” Coming in M4

Planned: explain this regulation in plain language, summarize evidence, retrieve relevant regulatory passages, and answer grounded questions.

The rules engine produces the compliance decision. AI explains and assists β€” it never makes or overrides the decision (see ADR-004).