AOG Recovery β€” VT-GHI

Every figure below is read from the same analytics the Control Tower, Planning, and Material Readiness pages use β€” no recovery action is taken automatically.

AOG

Recovery Path β€” Critical Chain

Work Order

DONE

Missing Part

BLOCKED

Vendor / Procurement

BLOCKED

Installation

DONE

Evidence

BLOCKED

Inspection / RII

DONE

Release

BLOCKED

AOG Reason

Cargo door latch mechanism exhibits excess play beyond service limit.

Critical / High-Priority Work Orders

  • WO-1046 β€” Cargo Door Latch Mechanism Inspection

Data Completeness: PARTIAL

Recovery Path β€” Work Order Readiness

Release readiness, technician authorization, and independent-inspection status for each critical work order β€” the same canonical engines used on the Task Card and Release Readiness dashboard, read together here to show what stands between this aircraft and recovery.

Work OrderTATRelease ReadinessAuthorized TechniciansInspection (RII)
WO-1046ON TRACK

Due 2026-03-22 Β· 5d remaining

Due in 5 day(s); no release blocker currently outstanding.

  • MATERIAL: Required material unavailable: LATCH-778
  • EVIDENCE: Evidence requirement is not defined for this task.
  • UNKNOWN: Not yet released β€” current execution state: BLOCKED.
  • REGULATORY: Assessment is NON COMPLIANT.
BLOCKED β€” 4 blockers1NOT REQUIRED

Recovery Plan

Every row below is a real blocker from the analysis above. Owner and next action are a direct read of the same responsible-role/action mapping getAogRecoveryAnalysis already uses to build the Recovery Options list β€” shown here per blocker instead of de-duplicated by category.

BlockerOwnerDependencyNext Action
MATERIAL

Required material unavailable: LATCH-778

ProcurementWO-1046 β€” Safety Gate: MATERIAL GATEInvestigate approved vendor sourcing (Procurement)
UNKNOWN

Evidence requirement is not defined for this task.

Maintenance ManagerWO-1046 β€” Safety Gate: EXECUTION EVIDENCE GATEEscalate blocker to maintenance manager
SAFETY

Not yet released β€” current execution state: BLOCKED.

Maintenance ManagerWO-1046 β€” Safety Gate: RELEASE GATEEscalate blocker to maintenance manager
DEFERRED

Deferred item due 2026-03-22.

Maintenance ManagerDeferred Item defer-2Review deferred item / MEL restriction
REGULATORY

Assessment asmt-bulk-3 is NON COMPLIANT.

ComplianceAssessment asmt-bulk-3Resolve non-compliant/review-required assessment (Compliance)

Primary Blocker

MATERIAL

Required material unavailable: LATCH-778

Source: WO-1046 β€” Safety Gate: MATERIAL GATE

Secondary Blockers

TypeDescriptionSource
UNKNOWNEvidence requirement is not defined for this task.WO-1046 β€” Safety Gate: EXECUTION EVIDENCE GATE
SAFETYNot yet released β€” current execution state: BLOCKED.WO-1046 β€” Safety Gate: RELEASE GATE
DEFERREDDeferred item due 2026-03-22.Deferred Item defer-2
REGULATORYAssessment asmt-bulk-3 is NON COMPLIANT.Assessment asmt-bulk-3

Recovery Options (Human Approval Required)

ActionResponsible Role
Investigate approved vendor sourcingProcurementOpen
Resolve missing evidence/reference before proceedingMaintenance Manager
Review deferred item / MEL restrictionMaintenance Manager
Resolve non-compliant/review-required assessmentComplianceOpen
Escalate blocker to maintenance managerMaintenance ManagerOpen